Built to fit. Built to last.

Precision ductwork.
Reliable results.

Custom sheet metal fabrication and HVAC ductwork for residential and commercial projects throughout New York—done right, on time, and with pride.

CustomBuilt for your project
New YorkServing projects citywide
ReliableQuality workmanship
English & EspañolBilingual service
SUPPLY
24 × 18
CUSTOM
TRANSITION
LC

Measured precisely.
Fabricated carefully.

Custom fabrication ✦ HVAC duct design ✦ Air conditioning ✦ Installation ✦ Repairs & modifications ✦

What we do

Built around
your project.

From one custom fitting to a complete duct system, we bring accuracy, practical solutions, and dependable service to every job.

01

Custom Fabrication

Made-to-measure transitions, plenums, curb adapters, fittings, and specialty sheet metal built for a precise fit.

Discuss your project →
02

HVAC Ductwork

Professional duct installation, replacement, and modification for residential and light commercial systems.

Discuss your project →
03

Repairs & Upgrades

Fast solutions for damaged, leaking, undersized, or outdated ductwork that needs to perform better.

Discuss your project →
04

Project Support

Reliable fabrication and field support for HVAC contractors, general contractors, and property managers.

Discuss your project →
05

Air Conditioning

Air conditioning installation, replacement, and system upgrades for residential and commercial spaces.

Discuss your project →

Precision in
every bend.

Why LC Sheet Metal

Small-business care.
Professional-grade work.

We understand that every project has its own measurements, timeline, and challenges. That is why we approach each job with close attention, honest communication, and solutions made to fit—not forced to fit.

  • 01 Clear, responsive communication
  • 02 Accurate custom fabrication
  • 03 Clean, dependable workmanship
  • 04 Support for jobs of every size
Work with us ↗

Our work

Made for the
real world.

Real LC Sheet Metal projects—from detailed planning and custom fabrication to clean interior and rooftop installations.

Custom rectangular sheet metal duct installation
Commercial Ductwork

Custom duct installation

01
Polished metal flue system installed in a mechanical room
Mechanical Room

Precision flue system

02
Suspended rectangular ductwork installation in progress
Interior Installation

Suspended duct system

03
Custom motorized damper louver ventilation system
Ventilation

Motorized damper louver system

04
Exposed rectangular ductwork installed above an office
Office HVAC

Complete office ductwork

05
Rooftop commercial exhaust and sheet metal transitions
Rooftop

Rooftop exhaust installation

06
Stainless steel rooftop vent and exhaust pipes
Rooftop

Stainless steel venting

07
Complete polished flue assembly in a mechanical room
Mechanical Room

Full flue assembly

08
HVAC ductwork plan with measurements and ruler
Planning

From plans to installation

09

Straightforward service

“Good ductwork starts with the right measurements—and ends with a system that fits exactly as it should.”

— LC Sheet Metal Ducts

Start a project

Let’s build it
right.

Tell us what you need. Share your measurements, drawings, or project details and we’ll get back to you with the next step.

English & Español · Bilingual service

☎Call us(917) 815-5478✉Email usgiochris75@gmail.com
⌖LocationBased in East Elmhurst, NY
↗Service areaProjects throughout New York
Request an estimateWe typically respond within one business day.